Saturday, October 20, 2007

Put A Lid On It



The lower dormitories are now ready for the winter, with the access stairwell covered up and dry. This represents another success (of sorts) for the closer. Unfortunately, its all temporary. The entire structure will have to come down this Spring, so that the retaining wall beneath it can be razed and rebuilt with stone.

sigh...

0 Comments